A repair visit starts with confirming the fuel supply and the controls, then checking the thermostat, burner or elements, relief valve, and the tank itself. If the tank is leaking, the conversation moves to replacement: same size and fuel, or a change such as an indirect tank tied to the boiler or a tankless unit.
For a gas replacement, your plumber files both the gas and plumbing permits with the Building Department at the Town House and books the inspection for a Tuesday or Thursday afternoon. If the request goes in after 2 pm, it rolls to the next inspection day, so a Thursday afternoon install may not be inspected until the following week.
Older Marion basements can be tight, with low stairs and narrow doorways, and a new tank may need venting or piping changes to meet current code.